Installation steps of curtain wall rock wool board 2

Release date:Aug 30,2021 Source:CCEWOOL Pageviews:-

     Curtain wall rock wool board is indispensable in daily construction work. The following will introduce the construction steps of the curtain wall rock wool board.

screen-wall-rock-wool-board

     1.Process flow: wall surface treatment→measurement and setting-off→stone and steel joist installation→cutting rock wool board→ pasting rock wool board and fixing with plastic expansion bolts→rock wool board inspection and acceptance→dry hanging and gluing of stone→curtain wall project acceptance.
     2.The steel joist is measured and laid out according to the design requirements of the external wall of the building, and then the steel joist is installed.
     3. Curtain wall rock wool board cutting and installation: We cut the rock wool board according to the spacing of the steel joist, and then pave the rock wool board horizontally from bottom to top. Afterwards, the rock wool boards are connected in staggered way and fixed vertically from the corner of the wall. The rock wool boards are interlocked at the internal and external corners. The rock wool board at the four corners of the door and window openings cannot be spliced. At this area, we should use a whole rock wool board to cut and form the incision perpendicular to the board surface. The corners of the wall also need to be pasted and fixed with the same insulation board. The upper and lower boards should be arranged in staggered way, and the staggered distance is about 1/2 board length. The width of the narrow rock wool board for embedding shall not be less than 150mm.
     4.Curtain wall rock wool board fixing: the installation depth of curtain wall rock wool board anchors into the structural wall should be no less than 50mm. Usually choose 8×120mm plastic expansion bolts for anchoring, and use an electric hammer to drill holes in the outer wall with a hole diameter of 12mm; the hole depth is 120mm (including the thickness of the insulation board), so that the curtain wall rock wool board and the outer wall are tightly combined. After the anchor is tightened, the anchor should be 1~2mm lower than the surface of the rock wool board of the curtain wall.
     Next issue we will continue to introduce the installation process of curtain wall rock wool board. Please stay tuned.
【Tag of this article】:curtain wall rock wool board
【Editor】:CCEWOOLall rights reserved:Please indicate the source
  • Oversea Office

    CCEWOOL Thermomax Inc. T: +(1)4167359078 E: rockwool@ccewool.com Add: 341 Talbot St, London, ON N6A 2R5

  • Customer Service

    Tel:+86-533-7986860 Fax:+86-533-6077229 service@ccewool.com

  • Factory

    Zibo Double Egret Thermal Insulation Co.,Ltd Add: Minying Industrial Park Development Zone Zibo Shandong China,255000

CCEWOOL

SitemapCopyright ©CCEWOOL. All rights reserved.CNZZTechnical Support:NSW