The tips of Stonewool board insulation construction

Release date:Aug 16,2021 Source:CCEWOOL Pageviews:-

     What are the tips for Stonewool board insulation construction? Let me introduce to you.

Stonewool-board-insulation

     1. Use reinforced grid cloth at door and window openings.
     2. Because the wall is impossible to be completely vertical and smooth, the wall must be polished to ensure the flatness of the wall, and after the stone wool board is installed the wall  must be polished and leveled a second time before hanging the grid mesh.  
     3. The insulation gap of Stonewool board insulation must be filled with stone wool strip , the stone wool strip must not be bonded, and no adhesive should be used to fill the joints.
     4. The internal and external corners of the external wall and the wall are not required to be vertical, but they must be straight and there should be no obvious corners.
     5. The Stone board at the corners of the door and window openings shall be cut out of a whole piece of stone wool board and shall not be spliced.
     6. Implement the management system that the person who do the construction work is responsible for the safety, quality and schedule of construction. 
     7. Make drip line at the top plate of the window, make slope at the bottom plate, and the drainage hole at the bottom of the window frame must not be blocked and ensure drainage to the outside.
     8. After the insulation construction of the Stonewool board insulation is completed, it needs to stand for at least 24 hours before polishing to prevent the stone wool board from moving and weaken the bonding strength between the board and the base wall.
     Above is the introduction of the tips of Stonewool board insulation construction. Hope this can bring you some help.
【Tag of this article】:Stonewool board insulation
【Editor】:CCEWOOLall rights reserved:Please indicate the source
  • Oversea Office

    CCEWOOL Thermomax Inc. T: +(1)7047402348 E: rockwool@ccewool.com Add: 15720 Brixham Hill Avenue, Floor 3, Charlotte, N.C. 28277

  • Customer Service

    Tel:+86-533-7986860 Fax:+86-533-6077229 service@ccewool.com

  • Factory

    Zibo Double Egret Thermal Insulation Co.,Ltd Add: Minying Industrial Park Development Zone Zibo Shandong China,255000

CCEWOOL

SitemapCopyright ©CCEWOOL. All rights reserved.CNZZTechnical Support:NSW