     This issue we will continue to introduce construction method of stone wool insulation board.

官网—product-news3

     10. The sticking of stone wool insulation board should adopt strip sticking method or point sticking method, and the glued area should not be less than 50%. After applying the adhesive to the stone wool insulation board, the lower end of the insulation board should be pasted to the base layer first. The stone wool insulation board should be laid horizontally from the bottom to the top, and should be anchored at the same time. The gap between two insulation board shall not be greater than 2mm. If the gap is wider than 2mm, it should be filled with insulation material. The adjacent insulation board should be at the same level, and the height difference between the boards shall not be greater than 1.5mm.
     11. The outlets of all the wall-penetrating pipelines and components should be filled with the same insulation material and be sealed and waterproofed.
     12. If the veneer layer is found to fall off during the construction process, it should be fixed in a timely manner by bonding or anchoring, and the exterior finish layer construction should be carried out in time.
     Next issue we will continue to introduce construction method of stone wool insulation board. Please stay tuned.
【Tag of this article】:stone wool insulation board
【Editor】:CCEWOOLall rights reserved:Please indicate the source
  • Oversea Office

    CCEWOOL Thermomax Inc. T: +(1)4167359078 E: rockwool@ccewool.com Add: 341 Talbot St, London, ON N6A 2R5

  • Customer Service

    Tel:+86-533-7986860 Fax:+86-533-6077229 service@ccewool.com

  • Factory

    Zibo Double Egret Thermal Insulation Co.,Ltd Add: Minying Industrial Park Development Zone Zibo Shandong China,255000

CCEWOOL

SitemapCopyright ©CCEWOOL. All rights reserved.CNZZTechnical Support:NSW