Construction process of stone wool insulation slab

Release date:Mar 15,2021 Source:CCEWOOL Pageviews:-

     As an emerging thermal insulation material for exterior walls, stone wool insulation slab has been widely used in insulation of building exterior walls and roof. The following items should be paid attention to during construction:

Stone-wool-insulation-slab

     1. Construction should start from the bottom to the top, and start from the supporting part, the stone wool board is pasted on the wall with bonding mortar. The bonding area should be greater than 35%, and the bonding area of first layer should be greater than 50%. If the outer sheath is heavier, 4-6 insulation nails should be nailed per square meter.
     2. After bonding, stop for 24 hours before proceeding with the protective layer construction.
     3. After another 24 hours, the external surface construction can be carried out.
     4. The thickness and density of the stone wool insulation slab should be in accordance with the design requirements, and in cold areas thicker stone wool slab should be used. stone wool insulation slab integrates building insulation and decoration.
     stone wool insulation slab has the characteristics of higher refractory temperature, higher melting point and smaller high-temperature linear shrinkage. At the same time, it has good water-repellent and moisture-proof performance, and will not corrode metals.
【Tag of this article】:stone wool insulation slab
【Editor】:CCEWOOLall rights reserved:Please indicate the source
  • Oversea Office

    CCEWOOL Thermomax Inc. T: +(1)7047402348 E: rockwool@ccewool.com Add: 15720 Brixham Hill Avenue, Floor 3, Charlotte, N.C. 28277

  • Customer Service

    Tel:+86-533-7986860 Fax:+86-533-6077229 service@ccewool.com

  • Factory

    Zibo Double Egret Thermal Insulation Co.,Ltd Add: Minying Industrial Park Development Zone Zibo Shandong China,255000

CCEWOOL

SitemapCopyright ©CCEWOOL. All rights reserved.CNZZTechnical Support:NSW